Steam Piping Stress Analysis, Inspection, Approval, modifications, parallelity , successful comissioning. Scope of Work Inspection of Existing Pipe lines routing, Spring Hangers & Supports for correctness. Stress Analysis of Pipe line & verifying the Forces & Moments data as per the STG requirements. Modifications recommendations as per the stress Analysis requirements for safe operation of the piping. Stress Analysis Report & Isometric Drawing with Nodes , Dimensions & Support details Detailed Springs Specifications & Approval Deatailed Engineering & Drawings of supports as per stress Analysis with Bill of Materials. Co-ordination & guidance to site for correct manufacturing , errection & commissioning of Supports. Inspection & Approval of supports at site. Achievemnet of Parallelity of Turbine Steam Inlet Flange as per Turbine Manufactures standard & recommendation. Successful commissioning & Operation. . Payment Terms: 30% Along with Work Order. 30% After Submission of Stress Analysis Reports 40% Successful commissiong. Travelling, Lodging & Boarding in your Scope. Taxes & Duties in your Scope as applicable. Transportation Charges if any in your scope at actual.